Loading...
First Group Engineering/ENG/Addl Serv/41,600/Structure Replacement over Tributary Williams Creek at Spring MillFirst Group Engineering Inc. Engineering - 2012 Appropriation #206- R4462300; P.D. #26542 Contract Not To Exceed $41,600.00 ADDITIONAL SERVICES AMENDMENT TO AGREEMENT FOR PURCHASE OF GOODS AND SERVICES THIS AMENDMENT TO THE GOODS AND SERVICES AGREEMENT ( "Agreement ") entered into by and between the City of Carmel and First Group Engineering, Inc. (the "Vendor"), as City Contract dated August 1, 2012 shall amend the terms of the Agreement by adding the additional services to be provided by Vendor consistent with the Scope of Work attached hereto and incorporated herein as Exhibit "A ". Furthermore, the terms of the Agreement shall be amended to include the E- verify requirement as stated in Indiana Code § 22 -5 -1.7 et seq., which is attached hereto and incorporated herein as Exhibit "B ", as well as the required E- verify Affidavit, attached hereto and incorporated herein as Exhibit "C ". The terms and conditions of the Agreement shall not otherwise be affected by this Additional Services Amendment and shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows: CITY OFCARMEL, INDIANA FIRST GROUP ENGINEERING, INC. by and through its Board of Public Works and Safety By: By: James Brainard, Presiding Officer Authorized Signature Date: A Mary Ann Date: Lori S. Watso•,' ember • Date: Tana Cordray, IAMC, • erk- Treasurer Date: be.,,■ v.i, Cc)lah Printed Name i� e b • d e Title FID/TIN: 35 - 1 to rt 3 i 7 ,' Last Four of SSN if Sole Proprietor: Date: 3 t7 ZS� ZQiz l \Intapp;l\Uar Dula - AdmuNAVA+4mW`Yro[Svcf Gafx/A Sr<!oe-nno g2012\f MST GR[1UP ENGINEERING - Addl Svc`Ana,L&,c:7,19(2012.I 31'PlAl July 17, 2012 Mr. Chuck Sims First Group Engineering Inc. 5925 Lakeside Blvd. Indianapolis, IN 46278 JAMES BRAINARD, MAYOR RE: Additional Service Amendment #1, PO # 26542 Dear Mr. Sims: As we discussed, the City of Carmel has a need for additional professional services and pursuant to our current contract with First Group, dated October 11, 2011. I have requested and received from you the proposed scope of services and fee estimates for the following work task: Additional Service Amendment #1— Structure Replacement over Tributary of Williams Creek at Spring Mill Rd, South of 106`h Street Engineering Services, Design Not to Exceed: $41,600.00 Per our contract procedural requirements, I hereby approve these Additional Professional Services estimates, and request that the Board of Public Works ratify the above referenced Contract Amendment. PLEASE NOTE Please be advised that "Additional Services" performed on City contracts must be billed separately from the original contract and other additional services. More importantly, the invoice must reference the appropriate Additional Service # and P.O. # shown above. Invoices received without the Additional Service # 'referenced will be returned for proper identification. Thank you for your continued assistance in providing the City of Carmel with your professional, quality services. If you should have any questions, please give me a call. Sincerely, ichael T. McBride, P.E. City Engineer Exhibit A- I l b iewed and appro ed by: S. C. Engel, ing DEPARTMENT OF ENGINEERING Director of Administration ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FA x 317.571.2439 EMAIL engineering@carmel.in.gov ENGINEERING, INC. March 5, 2012 Mike McBride P.E. City /Traffic Engineer City of Carmel One Civic Square Carmel, Indiana 46032 Re: Scope of Services and Fee Proposal Road Work and Structure Replacement Unnamed Tributary of Williams Creek Spring Mill Road, South of 106th Street Carmel, Indiana. Consulting Engineers 5925 Lakeside Blvd. Indianapolis, IN 46278 Phone (317) 290 -9549 Fax (317) 290-9560 6949 Kennedy Avenue Unit F Hammond, IN 46323 Phone (219) 844-'6752' Fax (219) 844 -6795 Dear Mr. McBride: We appreciate the opportunity to provide a proposal for performing the work as described in Alternate 2, Appendix 9 of the CBBEL Project No. 07 -0760, Williams Creek Watershed Master Plan. Please find attached our summary of the proposed work, estimated design costs and man -hour justification breakdown. Also attached is a copy of Appendix 9 as reference. If you have any questions or comments please call me anytime at 317-216-7705, extension 209 or 317 -372 -7308 (cell). If email is preferred: csum rr,firsteroupenaineerine.com Sincerely, Chuck Sims, Vice - President Transportation Design Services First Group Engineering Inc. STREETS — HIGHWAYS — TRAFFIC — STRUCTURES — WATER — SEWER — SURVEYING — RIGHT -OF -WAY SERVICES itommiNEW INSFPIVTE OF TRANSPORTATION ENGINEERS ACTIVE MEMBERSHIPS: AMERICAN SOOETY OF CIVIL ENGINEERS INDIANA SOCIETY OF PROFESSIONAL LAND SURVEYORS, INC. INTERNATIONAL RIGHT OF WAY ASSOCIATION ENGINEERING. INC Road and Drainage Structure Work for Unnamed Tributary of Williams Creek South of 106th Street City of Carmel, Indiana March 1, 2012 SUMMARY The proposed work items below are for Alternate 2 from Appendix 9 of the Williams Creek Watershed Master Plan. The proposed work would include: • Topographical Survey of project area • Approximately 900 feet of vertical realignment of Spring Mill Road. • Approximately 200 feet of vertical realignment of the private drive just south of the unnamed tributary east side of Spring mill Road. • Twin 8'X6" concrete culverts under Spring Mill Road • Soils Investigation for the Design of twin 8'X6" culverts under Spring Mill Road with subgrade and pavement design considerations. • Construction Plans including items shown on the Man -hour Justification • Maintenance of Traffic (MOT) Plans using Detour • Utility Coordination • Contract Documents • Preparation of Water Permits using information as provided in the Master Plan (IDEM 401, Rule 5, Corps 404 and IDNR Construction in a Floodway and possibly County Regulated Drain) Does not include: • Stream Modeling, drainage or detention design calculations • Determination of flood easements, wetland delineation or Environmental Mitigation • Route Survey Plat • Addition of sidewalks /bicycle facilities • Street Lighting • Plans for MOT phase construction Estimated Design Costs: Soils Investigation $ 5,000.00 Survey $ 9,000.00 Design and Permits $ 27,600.00 Total $ 41,600.00 30 MANHOUR JUSTIFICATION - SURVEY Road and Drainage Structure Work for Tributary of Williams Creek South of 106th Street City of Carmel, Indiana Manhours by Classification Description Project Manager Design Engineer Civil Designer Survey Crew Chief Total Pre Design Scope 0 Survey Letters to Property Owners 2 2 Utility Locates 4 4 Set/Re- Establish Control 6 6 Bench Circuit 6 6 Topo Survey (500 ft. or 500 pts. / day) 1 32 33 Sewer Survey 2 2 Survey Office Process (700 pts / day) 32 32 Research Deeds & Plats 4 4 Route Survey Plat 0 Total Hours 0 0 5 84 89 Hourly Costs $65.00 $41.13 $33.70 $37.38 Total Salary Costs $0.00 $0.00 $168.50 $3,139.92 $3,308.42 Overhead 134.42% $4,447.18 Salary Plus Overhead $7,755.60 Fixed Fee 15% $1,163.34 Direct Cost (Motel, Meals, Mileage) Motel $130.00 per night (0 nights) $0.00 Meals $26.00 per day (0 days) $0.00 Mileage $0.44 per Mile (80 miles) $36.00 $36.00 Total Fee $8,954.94 $9,000.00 Sheet 1 of 2 roue' ENGINEERING, RING, INC. MANHOUR JUSTIFICATION ROAD DESIGN Tributary of Williams Creek South of 106th Street Description Manhours by Classification Total Project Manager Design Engineer Civil Designer Plot and Check Topo for Plan & Profiles 0 0 4 Prepare Preliminary Title & Index Sheets 0 0 6 Preliminary Typical Cross Sections 0 0 4 Design Preliminary Grade and Geometrics 0 4 4 Guard Rail Design 0 6 4 Preliminary Intersection Details 0 0 0 Preliminary Structure Design 0 4 4 Preliminary Plan & Profiles 0 4 16 Preliminary Approach ( drive south of tributary) 0 2 2 Coordination with Soils Investigation 0 0 2 Preliminary Maintenance of Traffic Plans (Detour) 0 0 4 Preliminary Structure Data Tables 0 0 2 Plot and Check Preliminary Cross Sections 0 2 8 Preliminary Coordination with Utilities 0 0 4 Plot and Distribute Preliminary Plans 0 0 2 Preliminary Special Provisions 0 0 0 Preliminary Engineer's Estimate 0 1 4 PRELIMINARY PLANS FOR REVIEW 2 23 70 95 Sheet 2 of 2 MANHOUR JUSTIFICATION ROAD DESIGN Tributary of Williams Creek South of 106th Street Description Manhours by Classification Total Project Manager Design Engineer Civil Designer Finalize Title & Index Sheets 0 1 2 Finalize Typical Cross Sections 0 2 4 Final Structure Design 0 2 8 Finalize Plan & Profiles 0 2 16 Finalize Maintenance of Traffic Plans 0 1 8 Prepare Approach Tables 0 0 2 Final Approach & Drive Details 0 2 6 Spot Elevations Details 0 0 0 Miscellaneous Tables 0 1 4 Final Cross Sections 0 2 6 Final Intersection Details (geometrics) 0 0 0 Final Structure Data Tables 0 1 1 Erosion Control /Stormwater Management Plans 0 4 16 Final Pavement Markings 0 0 2 Utility Coordination 0 0 4 Plot & Distribute Final Plans 0 2 4 Permits 2 16 40 Quantity Calculations 0 2 8 Special Provisions and Contract Documents 0 32 0 Final Engineer's Estimate 0 1 2 Soils Investigation 0 0 0 FINAL PLANS (100% Complete) 2 71 133 206 TOTAL HOURS 4 94 203 301 HOURLY COSTS $65.00 $39.00 $31.15 TOTAL SALARY COSTS $260.00 $3,666.00 $6,323.45 $10,249.45 OVERHEAD (134.42) $13,777.31 SALARY PLUS OVERHEAD $24,026.76 15% FIXED FEE $3,604.01 DIRECT COSTS $0.00 TOTAL FEE $27,630.77 USE: $27,600.00