Loading...
First Group Eng/ENG/Addl Serv 2/$22000/Strutural Replacement Williams Creek ■ Firct Group Engineering, Inc. Engineering-2013 Appropriation 4211-4462300; P.0. 1126575 Contract Not To Exceed 522,000.00 Q op ADDITIONAL SERVICES AMENDMENT TO � �o AGREEMENT FOR PURCHASE OF GOODS AND SERVICES THIS AMENDMENT TO THE GOODS AND SERVICES AGREEMENT ("Agreement") entered into by and between the City of Carmel and First Group Engineering, Inc. (the "Vendor), as City Contract dated October 11, 2011 shall amend the terms of the Agreement by adding the additional services to be provided by Vendor consistent with the Scope of Work attached hereto and incorporated herein as Exhibit "A". Furthermore, the terms of the Agreement shall be amended to include the E-verify requirement as stated in Indiana Code § 22-5-1.7 et seq., which is attached hereto and incorporated herein as Exhibit "B", as well as the required E-verify Affidavit, attached hereto and incorporated herein as Exhibit "C". Also, pursuant to I.C. § 5-22-16.5, Vendor shall certify that in signing this document, it does not engage in investment activities within the Country of Iran. The terms and conditions of the Agreement shall not otherwise be affected by this Additional Services Amendment and shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows: CITY OF CARMEL, INDIANA First Group Engineering, Inc. by and through its Board of Public Works and Safety By By: l n James Brainard, Presiding Officer Authorized Signature Date: /, ��'nn15 (�)- �6h U/�� • �. Printed Name Mary Ann :urke, Member /� Date: ,3— 6 — /3 d2.4 Title •„ Lori S. Watsor, ember FID/TIN: 35-1693178 Date: -37r0 I t -a, Last Four of SSN if Sole Proprietor: ATTEST: •,� ( 1 Date: — 7 — t 3 Al it :116,. pia Cordray, IAMC, irk-Treasurer Date: /3 �lV...},y.ll,l(Y11GY-.Jnm'IAWuEl�ullVinlS,,..((iW.S.�J10.f11:0.(ll:l'EN flNEE0.M4-AYT,E�'"3011�11 Y..\f� RS - pe p C CITY 40F UATNIEL January 30. 2013 JAMES BR INA D, MAYOR Mr. Chuck Sims First Group Engineering Inc. 5925 Lakeside Blvd. Indianapolis, IN 46278 RE: Additional Service Amendment#2, PO #26575 Dear Mr. Sims: As we discussed, the City of Carmel has a need for additional professional services and pursuant to our current contract with First Group, dated October 11, 2011. I have requested and received from you the proposed scope of services and fee estimates for the following work task: Additional Service Amendment#2— Structure Replacement over Tributary of Williams Creek at Spring Mill Rd,South of 106'"Street Engineering Services, Design Supplement Not to Exceed: $22,000.00 Per our contract procedural requirements, I hereby approve these Additional Professional Services estimates,and request that the Board of Public Works ratify the above referenced Contract Amendment. PLEASE NOTE Please be advised that "Additional Services" performed on City contracts must be billed separately from the original contract and other additional services. More importantly,the invoice must reference the appropriate Additional Service#and P.O. if shown above. Invoices received without the Additional Service#referenced will be returned for proper identification. Thank you for your continued assistance in providing the City of Cannel with your professional, quality services. If you should have any questions, please give me a call. Sincerely, Michael T. McBride, P.E. City Engineer wit Rc�€.��ld approved by: DEPARTMENT (Jr ENGINEERING C. Engelki g ONE Civic SQUARE} CARMEL, IN 46032 OFFICE 317.571.2441 FAN 31757p�4�yor ofAdministra ton EMAIL engineeringi2(cannel.in.gov • Consulting Engineers s !Y" 5925 Lakeside Blvd. II Indianapolis,IN 46278 a�l"W )1610€„1:, PFax ((17) 290-9549 Fax (317) 290-9560 ENGINEERING. INC. 6949 Kennedy Avenue January 16, 2013 unu F Hammond, IN 46323 Phone(219) 844-6752 Fax(219)844-6795 Mike McBride P.E. City/Traffic Engineer City of Cannel One Civic Square Carmel, Indiana 46032 Re: Scope of Services and Fee Proposal for realignment and hydraulic modeling Road Work and Structure Replacement - Unnamed Tributary of Williams Creek Spring Mill Road, South of 106th Street Carmel, Indiana Dear Mr. McBride: Due to the revisions to the horizontal and vertical alignment, structure, path and lack of hydraulic information from the Christopher Burke stream modeling, additional work is proposed for this project. Please find attached our summary of the proposed added work, estimated design costs and man-hour justification breakdown. Upon your approval we will finish the plans and prepare a sub-agreement with USI for the stream modeling so they can complete the hydraulic analysis for the permitting. If you have any questions or comments please call me anytime at 317-216-7705, extension 209 or 317-372-7308 (cell). If email is preferred: csimsZ,,firsteroupengineerine.com Sincerely, ilak 97/1 Chuck Sims, Vice-President Transportation Design Services First Group Engineering Inc. m STREETS—HIGHWAYS—TRAFFIC—STRUCTURES—WATER—SEWER—SURVEYING—RIGHT-OF-WAY SERVICES ACTIVE MEMBERSHIPS: .°� wowusaaerr INTERNATIONAL mt. ®T.NAO[i�TOK n ua.WE2 )GFislaffeoWL , 7RI OIWAY 20 OFV1m5 G.1._lg•��. ����• UNO SI#NEYMI9.IML. p. Road and Drainage Structure Work for ,"1!t •, Unnamed Tributary of Williams Creek South of 106th Street . rti0 IQ>7/2.,.. City of Carmel, Indiana January 14, 2013 SUMMARY The proposed work items below are for a supplemental for realigning Spring Mill Road to minimize right of way taking,additional channel survey for stream modeling of the tributary under Spring Mill Road,stream modeling for the tributary under Spring Mill Road and adding an off roadway multi-use path along Spring Mill. The proposed work would include: • Additional Topographical Survey up and down stream of the proposed Structure for stream modeling • Approximately 890 feet of horizontal and vertical realignment of Spring Mill Road and add path • Approximately 200 feet of vertical realignment of the private drive just south of the unnamed tributary east side of Spring mill Road. • Revise location of concrete culvert under Spring Mill Road • USl to prepare stream modeling for tributary Estimated Design Costs: First Group Engr: Plan revisions and survey $10,500.00 USI Consultants: Stream modeling, structure size and type and coordination with Christopher Burke(CB) $6,500.00 Coordination with County for determination of floodway storage (if requested by City) $1,000.00 Additional coordination with the County $1,000.00 If base model is NOT provided by CB (if needed basis) $3,000.00 TOTAL $22,000.00 See attached man hours fees and email from UST identifying their portion of the work to complete. 7%3 JD